Crofthead Interchange - Road Closure (Monday 21 Sep)
A71 Bankton Road crossing Bankton Mains Footpath will be closed in two phases for removal and replacement of bridge deck
Phase 1 Closure
- Eastbound: A71 Bankton Road Eastbound between Newpark Roundabout and Crofthead Interchange
- Westbound: A71 westbound between Crofthead Interchange off-slip and Crofthead Interchange on-slip
Phase 2 Closure
- A71 Crofthead Interchange Westbound On-Slip
When will this take place?
The Road Closure will take place from 12.01am on Monday 21 September until 11.59pm on Tuesday 6 October
Diversion Routes
Phase 1 Closure
Eastbound: A71 Bankton Road Eastbound between Newpark Roundabout and Crofthead Interchange is closed. The diversion heading eastbound takes you North along Alderstone Road, at Almondvale Roundabout take the third exit and follow Almondvale Road when you will join the A899 southbound. At Lizzie Brice's Roundabout take the third exit to rejoin the A71 Bankton Road westbound.
Westbound: Exit the A71 Bankton Road at Crofthead Interchange. Take the second exit to rejoin the A71 westbound slip road and rejoin the A71 Bankton Road (westbound).
Phase 2 Closure
Crofthead Interchange Westbound On-Slip: At Crofthead Interchange Roundabout head north to join Dedridge West Road. At the junction turn left onto Dedridge North Road. At Adambrae Roundabout take the first exit to join Alderstone Road. The diversion ends when it meets Newpark Roundabout.
Map of closure and diversion
