Road Closures Commencing in October
Road closures and diversions planned to start in October.
High Port, Linlithgow will be closed from Back Station Road to the A803 for To allow for de-vegetation to be carried out at railway bridge
Parking will be suspended on North Street from number 64 down to the car park at the pedestrian crossing (McNeil Crescent) for SGN works to existing gas network
The C14 at Bridge Castle Bridge will be closed from the junction with B8028 to the north to entrance road to Bridge Castle House to the south west of the bridge for masonry repairs and repointing to bridge parapets and wing walls
Various parking suspensions will be in place in East Mains Industrial Estate for carriageway patching
Braekirk Avenue will be closed outside numbers 24 to 34 for ironworks maintenance and repairs
Birrell Gardens will be closed outside numbers 78 and 79 for ironworks repairs and maintenance
Almondvale Avenue will have a half road closure outside Wingstop to replace ironwork for Scottish Water.
Daisyhill Road will be closed outside numbers 45 - 47 for ironwork maintenance
The U37 will be closed between the junctions of Briestonhill View and Briestonhill Drive for ironworks repairs and maintenance