Toggle menu

Bathgate Road Closures

Road Closures

The U11 will be closed around the junction of Bowyett for BT ducting works
The A801 and B7002 Whitburn Road will be closed between Boghead and Pottishaw Roundabouts - overnight closure only for carraigeway resurfacing, street lighting and drainage upgrades
The U11 will be closed around Wester Woodside Cottage for duct work
Parking will be suspended on Edinburgh Road at Lindsay Gardens with a banned right turn into Lindsay Gardens and footpath closure also in place for resurfacing and cycle track construction
The C17 will be closed from the junction of C18 towards B792 for cabling works
Parking will be suspended on Drumcross Road from outside numbers 25 to 41 (on both sides) for Scottish Water lead pipe repairs .
Work to deliver significant road and infrastructure improvements on Edinburgh Road, Bathgate starts from 21 September 2026
The C14 at Bridge Castle Bridge will be closed from the junction with B8028 to the north to entrance road to Bridge Castle House to the south west of the bridge for masonry repairs and repointing to bridge parapets and wing walls
The C17 will be closed either side of the junctions with C18 for BT pole replacement
The A801 Boghead to Pottishaw Roundabout will be closed for carriageway resurfacing and street lighting upgrades. A section of the B7002 Whitburn Road on the approach to the Boghead roundabout will be closed overnight for a period during this project (signage will indicate when the overnight closures are taking place as the project progresses).